Like us on Facebook!

100,000,000 Engineering fail

0
4
High-rise condominium was to be opened in 2008. The building began to have settling problems. It sunk as much as 14 inches. The only option was...
Description: High-rise condominium was to be opened in 2008. The building began to have settling problems. It sunk as much as 14 inches. The only option was to destroy the building.
keith11378 Uploaded 03/28/2011
  • 2,415
  • 4
  • 0
  • Flag
Embed:
Use old embed code

COMMENTS

Top 5
Popular on 08/22/2011
awesome collection of funny fail videos pictures galleries and gifs